CSI_logo-mockup-long-2022.png
  • Infrastructure Innovation

  • Clean Industry

  • About Us

  • More

    Use tab to navigate through the menu items.
    • All Posts
    • Getting Started
    • Your Community
    Search
    City of Gresham: Upgrading a Wastewater Treatment Plant to be Energy Net Zero
    • Apr 26
    • 10 min

    City of Gresham: Upgrading a Wastewater Treatment Plant to be Energy Net Zero

    An Interview with Senior Wastewater Treatment Plant Engineer, Alan Johnston Through thoughtful planning and follow-through, the City of Gresham, Oregon was the first city in the Pacific Northwest to operate an Energy Net Zero Waste Water Treatment Plant. This plant generates enough energy on site to meet its demand for electricity to run the plant. In fact, it often generates more energy than it needs. The City of Gresham’s Business Sustainability Coordinator, Gregg Hay
    CSI Maps Wind and Solar Potentials Across WA
    • Apr 26
    • 2 min

    CSI Maps Wind and Solar Potentials Across WA

    The Center for Sustainable Infrastructure recently hired a Graduate Research Assistant to investigate the potential for renewable energy generation throughout Washington State. Read on to learn more about the findings and how they will inform our upcoming Infrastructure Excellence & Jobs Strategy for Washington. By Tyson West, Graduate Research Assistant Center for Sustainable Infrastructure Renewables are a fast-growing segment of the energy market with ever increasing

    info@centerforsi.org   |   (360) 867-8819

    The Center for Sustainable Infrastructure

    120 State Ave NE #303, Olympia, WA 98501

    ©2022 CSI

    DONATE
    • LinkedIn
    • Facebook
    • twitter